This kitchen remodel project focuses on installing a downdraft hood, requiring custom ductwork and careful planning for proper ventilation and clearance. The project involves various electrical work, including replacing a faulty ground fault and installing multiple circuits, culminating in drywall installation and finishing touches, with particular attention to the unique challenges posed by an open floor plan and downdraft hood.
Refrigerator Water Line Installation
• 00:00:05 The homeowner requested a water line for the refrigerator in its new location, prompting the decision to use PEX tubing for both the conduit and water line due to its ease of installation and flexibility. This solution allowed for efficient routing through existing holes and avoids overcrowding on the other side of the kitchen.
Electrical Work & Outlet Placement
• 00:03:14 Countertop receptacles are made the same height to ensure consistency with the tile backsplash installation. Adjustable depth boxes are used on backsplashes to allow for adjustments based on the backsplash chosen by the homeowner, and damaged wiring is identified and replaced, requiring tracing the circuit through the attic.
Custom Ductwork for Downdraft Hood
• 00:10:02 The homeowner desired a 3.5-inch by 8-inch duct in the wall, but local sheet metal shops declined the project. They decided to build it themselves using 3.25-inch by 10-inch duct from Home Depot, taping all seams with foil tape for maximum airflow. They meticulously measure and plan the duct's path to ensure a smooth transition from the downdraft hood to the attic and roof.
Drywall Installation & Finishing
• 00:17:14 Before hanging drywall, blocking is installed to provide a secure surface for future cabinet and other installations. The old drywall is prepped with screws to prevent loosening, and a drywall notcher is used to ensure a clean fit around window openings. Drywall installation progresses quickly, followed by filling holes and joints with hot mud.
Final Touches and Completion
• 00:22:52 The project nears completion with the finishing of the drywall installation and a final corner patched to ensure a seamless appearance. The remaining steps include the installation of the duct work, hot mudding, and taping, with the eventual completion of the entire kitchen remodel.